Esta página ha sido traducida usando Google Translate

Reducido

2016 Vermeer D23x30 S3

Comes with Drill Pipe, Equipment Trailer and Mud Mixing System! 3,114 horas.

Suscribir Los suscriptores del boletín reciben ofertas especiales y contenido exclusivo

Descripción

Descripción general:
2016 Vermeer D23x30 S3 Directional Drill:
-3,114 hours

Sistemas de mezcla:
2014 Vermeer MX125 500 gallon Mud Mixing System.

Tubo:
Full Rack of Drill Pipe.

Remolques:
Felling Equipment Trailer.

Información adicional:
This inspection report has been furnished solely for informational purposes and it is not to be construed in any way as a warranty or guarantee on the condition of the equipment. Buyers should confirm the accuracy of this report to their satisfaction prior to purchase. Buyer agrees to hold harmless HDD Broker, the seller, and the inspecting agent.

Videos

Documentos

Condition Reports:
Sellers Condition Report (5MB)

Si bien HDD Broker hace todos los esfuerzos posibles para garantizar la precisión de la información proporcionada por nuestros Vendedores, es en última instancia responsabilidad del Comprador confirmar todos los detalles a su entera satisfacción antes de la compra. Vea nuestros términos y condiciones.

HDD Broker utiliza cookies y recopila información personal en sus sitios web.

Para obtener más información, consulte la Política de privacidad y la Política de cookies de HDD Broker. Al hacer clic en "Acepto", usted indica que ha ajustado la configuración de su navegador para que se ajuste a sus preferencias y acepta el uso de cookies por parte de HDD Broker.

x